Pre-functional test
BG 88 Commissioning Responsibilities Framework, by Matt Lowry, published by BSRIA in January 2025, defines a pre-functional test (PFT) as: ‘A site-based procedure which validates that equipment and systems are connected and operational and confirms their state of readiness for functional performance testing.’
See also: Pre-functional testing.
--BSRIA
[edit] Related articles on Designing Buildings
- BSRIA articles.
- BSRIA definitions.
- BSRIA.
- Commissioning Air Systems BG 49/2024.
- Commissioning planning.
- Commissioning Responsibilities Framework BG 88/2025.
- Commissioning.
- Planning the commissioning of buildings.
- Pre-functional testing.
- Seasonal and continuous commissioning.
- Commissioning Air Systems BG 49/2024.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.
Building Safety Newsletter from MHCLG.
An extraordinary record of steel engineering worldwide.
Households living near new pylons to save on bills.
ECA warns growth must not outpace grid capacity or skills.
The role of the client and decision making
CIOB response to built environment professions call for evidence.
Construction's sustainability reporting revolution
Tracking upfront embodied carbon with digital tools.
ECA welcomes procurement reforms
Public spending must back British jobs and skills.